Forecast of Projects to be Awarded in Fiscal Year 2016 (Second Quarter Update)
Data Date: January 1, 2016
This page contains all Capital Improvements Program (CIP) projects anticipated to be awarded for construction in the current fiscal year listed initially in the City's Adopted CIP budget. This page is updated throughout the year with the current cost estimates and new projects to list. It also identifies which projects were already awarded to a construction contractor. In addition, some projects from the original list may roll-over to the first quarter of next fiscal year and possibly beyond due to unforeseen conditions. See Construction Contract Types for more information about delivery methods. Also, visit Bid and Contract Opportunities for projects currently in the bid and award phase For more information about this report, call (619) 533-4207 or email engineering@sandiego.gov.
A summary by asset-managing departments is listed at the bottom of this page.
* To sort on a column, click on its heading. To sort on multiple columns, hold the Shift key while clicking.
| Line Number |
Project Name |
Project Number |
Asset Managing Department |
Contract Type |
Estimated Contract Cost |
Estimated Total Project Cost |
Status | NEW |
|---|---|---|---|---|---|---|---|---|
| 1 | Brown Field Airport Runway 8L/26R Rehab | B11010 | Airport | Design Bid Build | $3,935,000 | $5,865,308 | Awarded | |
| 2 | Montgomery Fld MYF Terminal ADA Upgrades | B12073 | Airport | Design Bid Build | $620,641 | $898,000 | On Schedule | |
| 3 | Brown Field (SDM) Terminal ADA Upgrade | B12029 | Airport | Design Bid Build | $623,520 | $1,000,000 | Awarded | NEW |
| 4 | CNG Fueling Station for Refuse & Recycling | S15000 | Transportation | Design Build | $759,500 | $3,000,000 | Awarded | |
| 5 | Fire Station No. 05 - Hillcrest | S00788 | Buildings | Design Bid Build | $7,316,923 | $9,661,923 | On Schedule | |
| 6 | Fire Station No. 08 - Mission Hills | S10029 | Buildings | Design Bid Build | $508,500 | $863,500 | On Schedule | |
| 7 | Fire Station No. 15 - Ocean Beach Expansion | S13011 | Buildings | Design Bid Build | $425,000 | $660,000 | On Schedule | |
| 8 | Fire Station No. 17 - Mid-City | S00783 | Buildings | Design Bid Build | $7,085,909 | $12,028,624 | Awarded | |
| 9 | Fire Station No. 22 - Point Loma | S00787 | Buildings | Design Bid Build | $5,741,750 | $8,027,622 | On Schedule | |
| 10 | Fire Station No. 2 (Bayside) | 23432314 | Buildings | Design Bid Build | $14,610,989 | $20,000,000 | Awarded | NEW |
| 11 | Mission Hills-Hillcrest Library | S13022 | Buildings | Design Build | $11,847,523 | $17,847,523 | On Schedule | |
| 12 | Balboa Park Golf Course -Fuel Tank Installation | B12019 | Parks | Design Bid Build | $380,000 | $545,406 | On Schedule | |
| 13 | Orchard Av, Capri by Sea & Old Salt Pool | B14073 | Parks | Design Bid Build | $205,870 | $360,870 | On Schedule | |
| 14 | Angier Elementary School Joint Use | S00762 | Parks | Design Bid Build | $1,757,126 | $2,671,575 | Awarded | |
| 15 | California Tower Seismic Retrofit | L12003 | Parks | Design Bid Build | $1,011,000 | $1,650,000 | On Schedule | |
| 16 | Canyonside Community Park Improvements | S12004 | Parks | Design Bid Build | $710,540 | $999,833 | On Schedule | |
| 17 | Del Mar Mesa Neighborhood Park Ph II | S13023 | Parks | Design Bid Build | $1,440,354 | $2,060,354 | On Schedule | |
| 18 | Larsen Field ADA Improvements Phase II | S13004 | Parks | Design Bid Build | $1,127,065 | $1,691,718 | On Schedule | |
| 19 | Linda Vista Skate Park | S15008 | Parks | Design Bid Build | $1,740,000 | $3,040,000 | On Schedule | |
| 20 | Park de la Cruz Neighborhood Park Improvements | S15003 | Parks | Design Bid Build | $6,818,102 | $10,297,708 | On Schedule | |
| 21 | Mission Bay GC Practice Ctr Bldg Improve | S01090 | Parks | Design Bid Build | $963,882 | $1,400,000 | On Schedule | |
| 22 | Mission Bay GC Renovation/Reconstruction | S11010 | Parks | Design Bid Build | $2,100,000 | $2,960,000 | On Schedule | |
| 23 | Mountain View NP Area Upgrades | S11019 | Parks | Design Bid Build | $810,000 | $1,638,086 | Awarded | |
| 24 | North Park/Main St Sidewalk Improvements | S10040 | Transportation | Design Bid Build | $262,483 | $385,000 | Awarded | |
| 25 | Pacific Breezes (Ocean View Hills) CP | S00649 | Parks | Design Bid Build | $11,200,000 | $16,800,000 | On Schedule | |
| 26 | Pomerado Median Improve-N of R Bernardo | S10035 | Transportation | Design Bid Build | $640,000 | $1,084,840 | On Schedule | |
| 27 | Rancho Penasquitos Towne Centre Park Imp | S12003 | Parks | Design Bid Build | $118,500 | $175,000 | On Schedule | |
| 28 | Riviera Del Sol Neighborhood Park | S00999 | Parks | Design Bid Build | $4,224,204 | $6,924,640 | On Schedule | |
| 29 | SD River Dredging Qualcomm Way to SR163 | S00606 | Storm Water Drainage | Design Bid Build | $739,000 | $1,064,000 | On Schedule | |
| 30 | Silver Wing NP Sports Field/Lighting | S11051 | Parks | Design Bid Build | $189,850 | $1,228,452 | Awarded | |
| 31 | Tierrasanta CP Sports Field Lighting / S11011 | S11011 | Parks | Design Bid Build | $705,319 | $1,050,876 | Awarded | |
| 32 | Torrey Highlands Community ID & Enhance | S11009 | Transportation | Design Bid Build | $140,000 | $325,000 | On Schedule | |
| 33 | Torrey Meadows NP South | S00651 | Parks | Design Bid Build | $3,683,300 | $7,922,755 | On Schedule | |
| 34 | Torrey Pines N. Golf Course-Improvements | S14019 | Parks | Design Build | $12,585,000 | $14,170,000 | Awarded | |
| 35 | Trail for All People | S13001 | Parks | Design Bid Build | $238,500 | $511,000 | Awarded | |
| 36 | University Village Park Tot Lot | S13005 | Parks | Design Bid Build | $307,500 | $450,000 | On Schedule | |
| 37 | Webster Neighborhood Identification Sign | S14005 | Transportation | Design Bid Build | $10,000 | $40,000 | On Schedule | |
| 38 | West Maple Canyon MP | S00760 | Parks | Design Bid Build | $426,000 | $1,037,630 | On Schedule | |
| 39 | Wightman Street Neighborhood Park | S00767 | Parks | Design Bid Build | $1,884,000 | $3,480,779 | On Schedule | |
| 40 | Mira Mesa Community Park Expansion Phase 1B | S00667 | Parks | Design Build | $12,400,000 | $15,027,240 | On Schedule | NEW |
| 41 | Talmadge Historic Gates | L12001 | Parks | Design Bid Build | $315,000 | $472,500 | On Schedule | NEW |
| 42 | Police HQs CoGeneration Repower Project | S10131 | Buildings | Design Bid Build | $376,192 | $1,854,653 | Awarded | |
| 43 | Police Range Refurbishment | S10118 | Buildings | Design Bid Build | $900,000 | $1,078,000 | On Schedule | |
| 44 | Hodges Resv Hypolimnetic Oxygenation Sys | B15195 | Water | Design Build | $2,792,051 | $3,600,000 | On Schedule | |
| 45 | MBC Chemical System Improvements Phase 2 | B10178 | Sewer | Design Bid Build | $2,000,000 | $7,137,628 | Awarded | |
| 46 | SBWRP Sludge Pump & Grinder Installation | B14167 | Sewer | Design Bid Build | $376,500 | $789,000 | Awarded | |
| 47 | ROSE CANYONE TRUNK SEWER (RCTS) JOINT REPAIR | B11025 | Sewer | Design Bid Build | $5,671,800 | $6,233,000 | On Schedule | |
| 48 | S Mission Valley TS Accelerated Project | B14068 | Sewer | Design Bid Build | $315,000 | $600,000 | On Schedule | |
| 49 | Sorrento Mesa Recycled Water PL | B15080 | Water | Design Build | $2,297,400 | $2,837,000 | Awarded | |
| 50 | Citywide Manhole Improvements | B13177 | Sewer | Design Bid Build | $242,198 | $446,417 | Awarded | |
| 51 | Otay Valley Manhole Improvements Phase 2 | B14155 | Sewer | Design Bid Build | $1,709,833 | $2,226,120 | Awarded | |
| 52 | PIPELINE REHABILITATION - PHASE J-2 (LATERALS) | B11061 | Sewer | Design Bid Build | $2,700,000 | $8,799,999 | Awarded | |
| 53 | Pipeline Rehabilitation AC-1 | B14008 | Sewer | Design Bid Build | $3,764,428 | $4,741,197 | On Schedule | |
| 54 | Pipeline Rehabilitation AD-1 | B14009 | Sewer | Design Bid Build | $5,816,500 | $7,423,500 | On Schedule | |
| 55 | Pipeline Rehabilitation AF-1 | B14125 | Sewer | Design Bid Build | $1,662,408 | $5,406,021 | Awarded | |
| 56 | Pipeline Rehabilitation AG-1 | B14118 | Sewer | Design Bid Build | $4,417,000 | $5,437,000 | On Schedule | |
| 57 | Pipeline Rehabilitation AH-1B | B15146 | Sewer | Design Bid Build | $4,330,607 | $5,205,000 | Awarded | |
| 58 | Pipeline Rehabilitation Z-1A | B14110 | Sewer | Design Bid Build | $3,010,179 | $4,699,586 | Awarded | |
| 59 | SPS 13 14 16 25A & 85 Dual FM | B00501 | Sewer | Design Bid Build | $1,790,880 | $2,341,880 | On Schedule | |
| 60 | SPS 23T - Reliability Improvements | B14131 | Sewer | Design Bid Build | $1,179,861 | $1,592,861 | On Schedule | |
| 61 | SPS 76 Generator | B14168 | Sewer | Design Bid Build | $41,500 | $75,000 | On Schedule | |
| 62 | Penasquitos Creek Park RW Retrofit | B14143 | Parks | Design Bid Build | $48,900 | $121,500 | Awarded | |
| 63 | AC Water & Sewer Group 1014 (S) | B15079 | Sewer | Design Bid Build | $263,900 | $387,800 | On Schedule | |
| 64 | BUCHANAN CANYON SEWER B (UP) | B00429 | Sewer | Design Bid Build | $3,487,493 | $4,894,396 | On Schedule | |
| 65 | PACIFIC BEACH PIPELINE SOUTH (S) | B12117 | Sewer | Design Bid Build | $2,110,000 | $2,788,500 | On Schedule | |
| 66 | Sewer & AC Water Group 752 (S) | B00360 | Sewer | Design Bid Build | $1,956,000 | $3,342,986 | Awarded | |
| 67 | SEWER & WATER GROUP 701 | B00452 | Sewer | Design Bid Build | $4,571,000 | $5,987,600 | On Schedule | |
| 68 | Sewer and AC Water Group 785 (S) | B00383 | Sewer | Design Bid Build | $2,000,000 | $3,706,506 | Awarded | |
| 69 | Sewer and AC Water Group 827 (S) | B00436 | Sewer | Design Bid Build | $6,798,124 | $7,844,573 | On Schedule | |
| 70 | Sewer and Water Group 834 (S) | B13099 | Sewer | Design Bid Build | $3,463,504 | $5,018,002 | On Schedule | |
| 71 | SEWER GJ 798C | B00409 | Sewer | Design Bid Build | $212,420 | $484,380 | On Schedule | |
| 72 | SEWER GROUP 721 | B00460 | Sewer | Design Bid Build | $3,303,016 | $4,878,277 | Awarded | |
| 73 | Sewer Group 767A | B11077 | Sewer | Design Bid Build | $4,783,949 | $6,156,192 | Awarded | |
| 74 | SEWER GROUP 798 | B00399 | Sewer | Design Bid Build | $1,247,000 | $2,239,891 | Awarded | |
| 75 | Sewer Group 839 | B14070 | Sewer | Design Bid Build | $315,500 | $500,000 | On Schedule | |
| 76 | Tecolote Canyon 8-inch CI Sewer Main | B11111 | Sewer | Design Bid Build | $600,000 | $912,811 | On Schedule | |
| 77 | Tyrian Street and Soledad Avenue Sewer Main Replac | B12111 | Sewer | Design Bid Build | $915,000 | $1,346,500 | On Schedule | |
| 78 | Water & Sewer GJ 816 (S) | B00443 | Sewer | Design Build | $200,000 | $2,117,948 | Awarded | |
| 79 | Water and Sewer Group 954 (S) | B13203 | Sewer | Design Bid Build | $458,700 | $666,200 | On Schedule | |
| 80 | Water and Sewer Group 965 (S) | B12048 | Sewer | Design Bid Build | $2,182,900 | $2,932,600 | On Schedule | |
| 81 | La Jolla Country Club Reservoir | B11024 | Water | Design Bid Build | $4,534,250 | $6,782,000 | On Schedule | |
| 82 | False Bay RR Trunk Sewer | B00507 | Sewer | Design Bid Build | $1,662,702 | $2,061,532 | On Schedule | |
| 83 | Manning Canyon Sewer and Water Replacement (S) | B00504 | Sewer | Design Bid Build | $6,210,157 | $8,173,531 | On Schedule | |
| 84 | MOC 5 Materials Bins | B14133 | Sewer | Design Bid Build | $570,000 | $760,000 | On Schedule | |
| 85 | AC Water & Sewer Group 1014 (W) | B15078 | Water | Design Bid Build | $3,197,800 | $4,692,600 | On Schedule | |
| 86 | AC Water Group 1007 | B15036 | Water | Design Bid Build | $2,820,192 | $3,330,000 | On Schedule | |
| 87 | Manning Canyon Sewer and Water Replacement (W) | B00095 | Water | Design Bid Build | $575,132 | $1,031,544 | On Schedule | |
| 88 | Meadow Lark Dr/Health Center Dr Water Main | B15105 | Water | Design Build | $5,343,000 | $6,860,000 | Awarded | |
| 89 | Sewer & AC Water Group 752 (W) | B15058 | Water | Design Bid Build | $509,000 | $732,024 | Awarded | |
| 90 | Sewer & AC Water Group 785 (W) | B13208 | Water | Design Bid Build | $567,000 | $1,722,957 | Awarded | |
| 91 | Sewer & AC Water Group 834 (W) | B14141 | Water | Design Bid Build | $2,349,002 | $3,049,056 | On Schedule | |
| 92 | Sewer & Water Group 701 | B00039 | Water | Design Bid Build | $241,000 | $437,192 | On Schedule | |
| 93 | Sewer and AC Water Group 827 (W) | B15066 | Water | Design Bid Build | $275,694 | $420,694 | On Schedule | |
| 94 | USD Water Main Replacement Phase II | B15204 | Water | Design Bid Build | $850,000 | $1,600,000 | On Schedule | |
| 95 | Water and Sewer Group 954 (W) | B10187 | Water | Design Bid Build | $1,404,000 | $2,049,400 | On Schedule | |
| 96 | Water and Sewer Group 965 (W) | B12057 | Water | Design Bid Build | $2,081,600 | $2,934,600 | On Schedule | |
| 97 | Water Group Job 942 | B11038 | Water | Design Bid Build | $3,496,894 | $4,862,361 | Awarded | |
| 98 | Navajo Pump Station | B11023 | Water | Design Bid Build | $7,233,980 | $9,189,190 | On Schedule | |
| 99 | Bayview Reservoir Solar Project | S14021 | Water | Design Build | $2,057,500 | $2,325,000 | On Schedule | |
| 100 | Chollas Building | S11025 | Water | Design Build | $17,500,000 | $22,500,000 | On Schedule | |
| 101 | EMTS Boat Dock and Steam Line Relocation | S00319 | Sewer | Design Bid Build | $1,547,325 | $2,018,535 | On Schedule | |
| 102 | Lower Otay Reservoir Emer Outlet Improve | S00044 | Water | Design Bid Build | $1,725,930 | $3,146,971 | On Schedule | |
| 103 | MBC Odor Control Facility Upgrades | S00323 | Sewer | Design Bid Build | $5,097,000 | $7,715,612 | Awarded | |
| 104 | Miramar Clearwell Improvements | S11024 | Water | Design Bid Build | $97,162,485 | $114,728,744 | On Schedule | |
| 105 | MOC Complex Solar Project | S14022 | Sewer | Design Build | $2,372,500 | $2,675,000 | On Schedule | |
| 106 | Pacific Beach Pipeline South (W) | S12015 | Water | Design Bid Build | $20,985,032 | $27,516,758 | On Schedule | |
| 107 | PS2 Power Reliability & Surge Protection | S00312 | Sewer | Design Bid Build | $34,300,000 | $43,330,000 | On Schedule | |
| 108 | Tierrasanta (Via Dominique) Pump Station | S12040 | Water | Design Bid Build | $13,251,833 | $16,688,861 | On Schedule | |
| 109 | Upas St Pipeline Replacement | S11022 | Water | CMAR | $11,223,890 | $33,896,326 | Awarded | |
| 110 | Water & Sewer Group Job 816 (W) | S13015 | Water | Design Build | $300,000 | $17,093,883 | Awarded | |
| 111 | WDSU - Reservoirs & Dams - Phase II | S11106 | Water | Design Build | $2,680,000 | $3,480,000 | On Schedule | |
| 112 | Pipeline Rehabilitation Z-1 | B13209 | Sewer | Design Bid Build | $1,299,108 | $1,685,107 | Awarded | NEW |
| 113 | North City Water Reclamation Plant Sludge Pump Upgrade | S00309 | Sewer | Design Bid Build | $430,259 | $636,294 | Awarded | NEW |
| 114 | Recycled Water Tank Modifications | S12014 | Water | Design Build | $1,036,993 | $1,400,000 | Awarded | NEW |
| 115 | Sewer and Water Group 840 | B15113 | Sewer | Design Bid Build | $462,730 | $598,230 | Awarded | NEW |
| 116 | Sewer and Water Group 840 | B15114 | Sewer | Design Bid Build | $378,598 | $551,895 | Awarded | NEW |
| 117 | Sewer and Water AC Group 778 (S) | B00388 | Sewer | Design Bid Build | $8,938,755 | $10,589,161 | On Schedule | NEW |
| 118 | Sewer & Water GJ Crown Pt s La Playa (S) | B10210 | Sewer | Design Bid Build | $7,000,000 | $7,782,303 | On Schedule | NEW |
| 119 | Sewer & Water GJ Crown Pt s La Playa (W) | B13011 | Water | Design Bid Build | $1,804,638 | $2,674,476 | On Schedule | NEW |
| 120 | AC Water Group 1008 | B14117 | Water | Design Bid Build | $3,108,000 | $4,144,000 | On Schedule | NEW |
| 121 | Sewer and AC Water Group 778 (W) | B15069 | Water | Design Bid Build | $7,832,801 | $10,461,301 | On Schedule | NEW |
| 122 | AC Water Group 1028 | B15122 | Water | Design Bid Build | $5,054,700 | $7,414,100 | On Schedule | NEW |
| 123 | La Jolla Scenic Drive Pipeline (S) | B15176 | Sewer | Design Build | $406,400 | $575,100 | On Schedule | NEW |
| 124 | La Jolla Scenic Dr 16in main | S12009 | Water | Design Build | $5,900,600 | $8,280,800 | On Schedule | NEW |
| 125 | Water Group 955A | B15233 | Water | Design Bid Build | $2,510,208 | $3,674,648 | On Schedule | NEW |
| 126 | Emergency Strobe Lights at MBC, SB | B13227 A | Sewer | Design Bid Build | $300,000 | $400,000 | Awarded | NEW |
| 127 | Emergency Strobe Lights at NC | B13227 B | Sewer | Design Bid Build | $265,000 | $354,000 | On Schedule | NEW |
| 128 | Chollas Material Bins | S15043 | Water | Design Build | $800,000 | $1,200,000 | On Schedule | NEW |
| 129 | El Cuervo Del Sur Wetlands Mitigation | 21003730 | Parks | Design Bid Build | $569,465 | $569,465 | Awarded | NEW |
| 130 | South Chollas Wash Replacement | B14128 | Water | Design Bid Build | $399,993 | $500,000 | Awarded | NEW |
| 131 | Common Area Improvements at PLWWTP | 21002978 | Sewer | Design Bid Build | $48,525 | $51,729 | Awarded | NEW |
| 132 | Repair & Improvement of SBWRP HVAC System | 21002978 | Water | Design Bid Build | $310,211 | $310,211 | Awarded | NEW |
| 133 | Fire Station #44 Hydrogen Peroxide Tank | 21001510 | Water | Design Bid Build | $228,674 | $400,000 | Awarded | NEW |
| 134 | 67th b/s El Cajon to Richard Bond MS DS | B13061 | Transportation | Design Bid Build | $153,470 | $288,000 | Awarded | |
| 135 | Alzheimer Family Center ADA Improvements | B12074 | Buildings | Design Bid Build | $231,416 | $624,300 | Awarded | |
| 136 | Barrio Youth Facilities 2 & 3 | B13067 | Buildings | Design Bid Build | $492,820 | $853,370 | On Schedule | |
| 137 | Bay Bridge Community Center ADA Improvements | B13076 | Buildings | Design Bid Build | $304,000 | $608,000 | On Schedule | |
| 138 | Carmel Creek Park Comfort Station ADA Access Impr | B14153 | Parks | Design Bid Build | $159,185 | $234,000 | On Schedule | |
| 139 | Carmel Del Mar Comfort Station ADA Accessilibty Im | B14154 | Parks | Design Bid Build | $317,200 | $431,000 | On Schedule | |
| 140 | Carmel Valley Rec Ctr ADA Accessibility Improvement | B14152 | Buildings | Design Bid Build | $280,000 | $446,363 | On Schedule | |
| 141 | City Heights Youth & Community Center ADA | B13068 | Buildings | Design Bid Build | $228,000 | $503,000 | On Schedule | |
| 142 | Colina Del Sol Pool ADA | B13077 | Buildings | Design Bid Build | $480,960 | $836,477 | On Schedule | |
| 143 | El Cajon & 59th Obstruction DIF CR DS | B13105 | Transportation | Design Bid Build | $152,584 | $211,648 | On Schedule | |
| 144 | Euclid w/s Federal Blvd to Marilou Bond MS DS | B13060 | Transportation | Design Bid Build | $55,374 | $150,000 | Awarded | |
| 145 | Golden Hill CR Obstruction DIF 14 | B14052 | Transportation | Design Bid Build | $145,700 | $265,200 | On Schedule | |
| 146 | Group Job 13F Linda Vista DIF CR | B13108 | Transportation | Design Bid Build | $247,754 | $323,000 | On Schedule | |
| 147 | Group Job 13H Midway-Pacific DIF CR | B13110 | Transportation | Design Bid Build | $124,990 | $270,300 | Awarded | |
| 148 | Group Job 13I North Park DIF CR | B13111 | Transportation | Design Bid Build | $308,700 | $466,800 | On Schedule | |
| 149 | Group Job 13J Peninsula DIF CR | B13112 | Transportation | Design Bid Build | $261,200 | $404,800 | On Schedule | |
| 150 | Mission Beach Community Center | B12004 | Buildings | Design Bid Build | $116,655 | $342,100 | Awarded | |
| 151 | Mission Beach Obstruction DIF 13 CR | B13125 | Transportation | Design Bid Build | $169,850 | $245,000 | On Schedule | |
| 152 | Orange & Altadena CR Obstruction DS | B13072 | Transportation | Design Bid Build | $95,070 | $210,000 | Awarded | |
| 153 | Santa Clara Recreation Center - ADA | B12006 | Parks | Design Bid Build | $724,970 | $1,109,241 | Awarded | |
| 154 | SY Comm and Rec CTR-ADA Barrier Removal | B13078 | Buildings | Design Bid Build | $696,200 | $1,240,000 | On Schedule | |
| 155 | Air & Space Museum Elevator Modernization | B10035 | Buildings | Design Build | $353,123 | $433,123 | On Schedule | |
| 156 | Fire Station 14 Roof & HVAC Replacement | B13189 | Buildings | Design Bid Build | $501,000 | $755,000 | On Schedule | |
| 157 | Fire Station 19 Roof & HVAC Replacement | B13190 | Buildings | Design Bid Build | $666,500 | $1,000,000 | On Schedule | |
| 158 | Fire Station 3 Roof & HVAC Replacement | B13187 | Buildings | Design Bid Build | $745,019 | $1,135,019 | On Schedule | |
| 159 | Malcolm X Library Facility Repairs | B10038 | Buildings | Design Bid Build | $516,800 | $725,000 | On Schedule | |
| 160 | Museum of Art Elevator Modernization | B10042 | Buildings | Design Build | $919,293 | $1,130,293 | On Schedule | |
| 161 | Fleet Servs Elect & Fac Impvts. | L14002 | Buildings | Design Bid Build | $364,500 | $733,000 | On Schedule | |
| 162 | Sunset Cliffs Hillside Improvemenst Phase 1A | S10091 | Parks | Design Bid Build | $201,700 | $4,178,818 | Awarded | NEW |
| 163 | Siva & Main CR Obstruction | B14053 | Transportation | Design Bid Build | $96,530 | $244,804 | Awarded | NEW |
| 164 | Pioneer Park & Comfort Station - ADA | B12005 | Parks | Design Build | $433,086 | $535,086 | On Schedule | NEW |
| 165 | Southeastern Obstruction DIF 13 CR | B13106 | Transportation | Design Bid Build | $169,000 | $300,000 | On Schedule | NEW |
| 166 | Former Valencia Park Library (101 50th Street) Demolition | 24005705 | Buildings | Design Bid Build | $106,578 | $383,018 | Awarded | NEW |
| 167 | Lyceum Theatre Renovation | 24005563 | Buildings | Design Bid Build | $2,918,000 | $3,437,500 | Awarded | NEW |
| 168 | Kearny Mesa Recreation Center | B16039 | Buildings | Design Bid Build | $148,968 | $553,000 | Awarded | NEW |
| 169 | Linda Vista Recreation Center | B16040 | Buildings | Design Bid Build | $291,179 | $302,000 | Awarded | NEW |
| 170 | Qualcomm Stdm Concrete Spalling | B15027 | Buildings | Design Bid Build | $22,107 | $224,000 | Awarded | |
| 171 | Qualcomm Stdm Fiber Optic & CATV | B14071 | Buildings | Design Build | $335,000 | $500,000 | On Schedule | |
| 172 | Qualcomm Stdm Elevator Modernization | B15000 | Buildings | Design Bid Build | $131,000 | $160,000 | On Schedule | NEW |
| 173 | Replace Barrier Rail on Barnett o/ PCH | B00869 | Transportation | Design Bid Build | $322,682 | $853,508 | Awarded | |
| 174 | Burroughs & W Dunlop Sts Storm Dr Repl | B13101 | Storm Water Drainage | Design Bid Build | $492,929 | $860,887 | On Schedule | |
| 175 | Cardinal Dr (2383) Storm Drain Replacemt | B12025 | Storm Water Drainage | Design Bid Build | $600,000 | $1,000,000 | Awarded | |
| 176 | Hornblend Alley (1761) Storm Drain Upgrade | B12035 | Storm Water Drainage | Design Bid Build | $362,000 | $550,000 | On Schedule | |
| 177 | Industrial Ct Channel Replacement | B13118 | Storm Water Drainage | Design Bid Build | $222,000 | $400,000 | On Schedule | |
| 178 | Jean Drive Storm Drain Replacement | B11013 | Storm Water Drainage | Design Bid Build | $390,000 | $745,000 | On Schedule | |
| 179 | Langmuir St (2252) Storm Drain Replacement | B12091 | Storm Water Drainage | Design Bid Build | $232,680 | $900,000 | On Schedule | |
| 180 | Whitney Ct (6969) Storm Drain Replacemt | B13210 | Storm Water Drainage | Design Bid Build | $228,000 | $419,000 | On Schedule | |
| 181 | 70th St, Pso Lucido & San Ysidro St Lts | B14064 | Transportation | Design Bid Build | $187,171 | $270,970 | Awarded | |
| 182 | City Street Lights - 25 Locations | B14106 | Transportation | Design Bid Build | $184,600 | $275,300 | On Schedule | |
| 183 | New Street Lights - 19 Locations | B14012 | Transportation | Design Bid Build | $282,450 | $389,200 | On Schedule | |
| 184 | Mission Bl-Ventura/Sn Fernando Turn Pocket | B14093 | Transportation | Design Bid Build | $152,200 | $294,814 | On Schedule | |
| 185 | University Ave-Winona to 50th Median | B13093 | Transportation | Design Bid Build | $518,000 | $755,000 | On Schedule | |
| 186 | N Harbor Dr Pedestrian Access Improvmnts | B12060 | Transportation | Design Bid Build | $598,570 | $908,728 | Awarded | |
| 187 | 31st St & Market St School Traffic Sgnal | B15014 | Transportation | Design Bid Build | $192,000 | $275,000 | On Schedule | |
| 188 | 38th at Wightman Popouts | B13087 | Transportation | Design Bid Build | $375,573 | $594,000 | Awarded | |
| 189 | 60th St and Vale Way Traffic Circle | B14056 | Transportation | Design Bid Build | $180,000 | $278,000 | On Schedule | |
| 190 | C Street-Park to 16th-Ped Improvements | B15019 | Transportation | Design Bid Build | $163,688 | $291,000 | Awarded | |
| 191 | Orange Av btwn 49 & Winona Xwlk | B12080 | Transportation | Design Bid Build | $271,000 | $351,000 | On Schedule | |
| 192 | 36th St & El Cajon Bl Traffic Signal | B13138 | Transportation | Design Bid Build | $252,993 | $330,000 | On Schedule | |
| 193 | 3rd Ave @ Washington St Traffic Signal | B14062 | Transportation | Design Bid Build | $303,200 | $395,100 | On Schedule | |
| 194 | Division St & Osborn St Traffic Signal | B15047 | Transportation | Design Bid Build | $212,200 | $275,000 | On Schedule | |
| 195 | Division St & Valencia Pky Traffic Signal | B15008 | Transportation | Design Bid Build | $232,155 | $301,000 | On Schedule | |
| 196 | Traffic Signal Upgrades Citywide FY14 | B14048 | Transportation | Design Bid Build | $95,517 | $814,400 | Awarded | |
| 197 | 28th Street UUD (Island Av - Clay St) | B13156 | Transportation | Design Bid Build | $265,000 | $337,000 | On Schedule | |
| 198 | 30th Street Phase III Broadway to K UUD | B00717 | Transportation | Design Bid Build | $434,000 | $558,000 | On Schedule | |
| 199 | 32nd Street UUD (Market St - F St) | B13144 | Transportation | Design Bid Build | $70,000 | $91,000 | On Schedule | |
| 200 | Altadena/Wightman/Winona-El Cajon UUD | B00850 | Transportation | Design Bid Build | $182,684 | $216,453 | On Schedule | |
| 201 | Block 1M UUD (La Jolla 4) / B13151 | B13151 | Transportation | Design Bid Build | $316,800 | $396,000 | On Schedule | |
| 202 | Block 2S1 South Mission Beach UUD | B12067 | Transportation | Design Bid Build | $302,400 | $378,000 | On Schedule | |
| 203 | Block 4-J1 UUD (Mid City) | B13152 | Transportation | Design Bid Build | $324,000 | $405,000 | On Schedule | |
| 204 | Block 6DD1 UUD (Clairemont Mesa) | B13153 | Transportation | Design Bid Build | $439,200 | $549,000 | On Schedule | |
| 205 | Block 7O1 UUD (College Area) | B13154 | Transportation | Design Bid Build | $388,800 | $486,000 | On Schedule | |
| 206 | Block 7R Allied Gardens UUD | B12064 | Transportation | Design Bid Build | $357,319 | $1,249,000 | Awarded | |
| 207 | Block 8A Golden Hill UUD | B12056 | Transportation | Design Bid Build | $168,984 | $231,445 | Awarded | |
| 208 | Block 8C UUD (Greater Golden Hill) | B13155 | Transportation | Design Bid Build | $345,600 | $432,000 | On Schedule | |
| 209 | Cardiff Street UUD (Carlisle Dr - Wade St) | B13145 | Transportation | Design Bid Build | $270,000 | $375,000 | On Schedule | |
| 210 | District 7 Block 7-A UUD | B00842 | Transportation | Design Bid Build | $720,346 | $807,113 | On Schedule | |
| 211 | District 8 Block 8-B UUD | B00841 | Transportation | Design Bid Build | $384,852 | $449,890 | On Schedule | |
| 212 | Euclid Ave UUD Streetlights (Euclid-Univ) | B11131 | Transportation | Design Bid Build | $127,802 | $167,488 | On Schedule | |
| 213 | Fanual St PI Archer to Tourmaline UUD | B00721 | Transportation | Design Bid Build | $234,000 | $334,000 | On Schedule | |
| 214 | Fanual Street Phase II Grand to Reed UUD | B00722 | Transportation | Design Bid Build | $319,000 | $478,000 | On Schedule | |
| 215 | Howard Avenue UUD (Park Bl - I-805) | B13146 | Transportation | Design Bid Build | $266,400 | $333,000 | On Schedule | |
| 216 | Illion Street UUD (Gardena Av - Milton St) | B13147 | Transportation | Design Bid Build | $83,000 | $125,000 | On Schedule | |
| 217 | Lincoln Av UUD (30th St-Wabash Av) | B12066 | Transportation | Design Bid Build | $32,557 | $43,737 | On Schedule | |
| 218 | Moraga Ave Ph II -Moraga Ct to Monair UUD | B00788 | Transportation | Design Bid Build | $137,237 | $161,937 | On Schedule | |
| 219 | Paradise Valley Rd UUD (Potomac St-Parkland Wy) | B13149 | Transportation | Design Bid Build | $63,000 | $88,000 | On Schedule | |
| 220 | Potomac St UUD (Calle Tres Lomas-Sea Breeze) | B12069 | Transportation | Design Bid Build | $56,722 | $73,018 | On Schedule | |
| 221 | San Vicente Street to Ashmore UUD | B00725 | Transportation | Design Bid Build | $300,000 | $400,000 | On Schedule | |
| 222 | Sunset Cliffs Dr Coronado to Newport UUD | B00720 | Transportation | Design Bid Build | $46,687 | $52,931 | On Schedule | |
| 223 | Trojan Ave 56th to 60th UUD | B00718 | Transportation | Design Bid Build | $166,000 | $209,000 | On Schedule | |
| 224 | Beta Street and 37th Street Green Alley | B11057 | Storm Water Drainage | Design Bid Build | $585,100 | $786,959 | On Schedule | |
| 225 | Maple Canyon Restoration - Phase 1 | B12040 | Storm Water Drainage | Design Bid Build | $2,465,759 | $4,069,999 | On Schedule | |
| 226 | 34th & 35th @ Madison Ave Improvements | S00922 | Transportation | Design Bid Build | $523,488 | $1,395,854 | Awarded | |
| 227 | Alta La Jolla Drive Drainage Repair PhII | S10001 | Storm Water Drainage | Design Bid Build | $3,820,704 | $6,206,105 | Awarded | |
| 228 | Azalea Park Artistic Enhancement | S00700 | Transportation | Design Bid Build | $73,000 | $387,968 | Awarded | |
| 229 | Carmel Country Road Low Flow Channel | S00969 | Storm Water Drainage | Design Bid Build | $812,300 | $1,842,800 | On Schedule | |
| 230 | Cherokee Street Improvements | S00921 | Transportation | Design Bid Build | $899,950 | $1,986,005 | Awarded | |
| 231 | Coolidge Street Storm Drain | S11003 | Storm Water Drainage | Design Bid Build | $212,500 | $548,000 | Awarded | |
| 232 | El Camino Real/SR 56 Bike Path Connector | S00981 | Transportation | Design Bid Build | $169,998 | $545,340 | Awarded | |
| 233 | Five Points Neighborhood Pedestrian Impr | S00988 | Transportation | Design Bid Build | $315,000 | $735,000 | On Schedule | |
| 234 | Georgia Street Bridge Improvements | S00863 | Transportation | Design Bid Build | $7,360,459 | $14,375,795 | On Schedule | |
| 235 | La Jolla Mesa Drive Sidewalk | S00928 | Transportation | Design Bid Build | $585,900 | $837,000 | On Schedule | |
| 236 | Mission Beach Boardwalk Bulkhead | S00726 | Transportation | Design Bid Build | $2,174,347 | $4,361,846 | Awarded | |
| 237 | Old Otay Mesa Road-Westerly | S00870 | Transportation | Design Bid Build | $8,953,830 | $14,941,670 | Awarded | |
| 238 | Pacific Beach Curb Ramp Barrier Removal | S11048 | Transportation | Design Bid Build | $169,850 | $246,000 | On Schedule | |
| 239 | Pacific Hwy Curb Ramp Barrier Removal | S11045 | Transportation | Design Bid Build | $194,630 | $450,000 | Awarded | |
| 240 | Palm Avenue Roadway Improvements "Phase II" | S00913 | Transportation | Design Bid Build | $1,539,554 | $4,617,209 | Awarded | |
| 241 | Regents Rd Widening-Genesee to Executive | S00881 | Transportation | Design Bid Build | $3,900,000 | $6,623,209 | On Schedule | |
| 242 | SR 163/Friars Road | S00851 | Transportation | Design Bid Build | $26,300,000 | $49,830,628 | Awarded | |
| 243 | Streamview Drive Improvements | S00864 | Transportation | Design Bid Build | $2,528,695 | $3,475,000 | Awarded | |
| 244 | Torrey Pines Road Slope Restoration | S00877 | Transportation | Design Bid Build | $1,800,000 | $2,831,576 | On Schedule | |
| 245 | District 1 Block 1-F UUD | B00708 | Transportation | Design Bid Build | $297,200 | $356,640 | Awarded | NEW |
| 246 | District 3 Block 3-FF UUD | B00710 | Transportation | Design Bid Build | $131,000 | $157,200 | Awarded | NEW |
| 247 | District 4 Block 4-G District 4 UUD | B00711 | Transportation | Design Bid Build | $230,000 | $276,000 | Awarded | NEW |
| 248 | District 3 Block 3-EE UUD | B00825 | Transportation | Design Bid Build | $109,000 | $130,800 | Awarded | NEW |
| 249 | Kensington Manor No. 1 Streetlight Circuit Upgrade | B00863 | Transportation | Design Bid Build | $615,653 | $742,638 | Awarded | NEW |
| 250 | District 2 Block 2-T UUD | B00835 | Transportation | Design Bid Build | $1,320,605 | $1,467,339 | On Schedule | NEW |
| 251 | District 2 Block 2-T UUD | B00835 | Transportation | Design Bid Build | $72,422 | $907,928 | Awarded | NEW |
| 252 | District 8 Block 8G UUD | B00829 | Transportation | Design Bid Build | $503,351 | $1,116,474 | Awarded | NEW |
| 253 | District 8 Block 8-F UUD | B00714 | Transportation | Design Bid Build | $786,144 | $1,629,445 | Awarded | NEW |
| 254 | K Street - 19th to 30th UUD | B00851 | Transportation | Design Bid Build | $338,673 | $514,137 | Awarded | NEW |
| 255 | Island Ave from 20th to 30th UUD | B00705 | Transportation | Design Bid Build | $145,032 | $616,010 | Awarded | NEW |
| 256 | Signal Mods in Barrio Logan | B13010 | Transportation | Design Bid Build | $282,800 | $427,600 | On Schedule | NEW |
| 257 | Friars Rd & Sea World Dr Signal Mod | B13133 | Transportation | Design Bid Build | $111,500 | $173,000 | On Schedule | NEW |
| 258 | Uptown Traffic Signal Upgrades | B14010 | Transportation | Design Bid Build | $103,404 | $159,500 | Awarded | NEW |
| 259 | Castle Storm Drain Replacement | B15225 | Storm Water Drainage | Design Bid Build | $345,000 | $500,000 | On Schedule | NEW |
| 260 | Linda Vista/Genesee Intersection Improve | S00907 | Transportation | Design Bid Build | $416,523 | $888,000 | Awarded | NEW |
| 261 | Midway Street Bluff Repair | S12005 | Transportation | Design Bid Build | $190,828 | $475,000 | Awarded | NEW |
| 262 | Moraga Ave to Idelwild UUD (Phase I) | B00726 | Transportation | Design Bid Build | $139,389 | $142,389 | On Schedule | NEW |
| 263 | NATL Ave (32nd to 43rd) UUD | B00787 | Transportation | Design Bid Build | $818,865 | $909,850 | On Schedule | NEW |
| 264 | District 3 Block 3-HH UUD - Street Light Design (57) | B00837 | Transportation | Design Bid Build | $460109 | $1,253,000 | Awarded | NEW |
| 265 | District 4 Block 4-Z UUD (AA370280) | B00838 | Transportation | Design Bid Build | $593,869 | $604,868 | On Schedule | NEW |
| 266 | Briarwood UUD Streetlights (Brookhaven to Nebraska) | B00848 | Transportation | Design Bid Build | $33,561 | $37,289 | On Schedule | NEW |
| 267 | 24th St UUD Streetlights (G St-Imperial) - Curb Ramp Design (20) | B10197 | Transportation | Design Bid Build | $346,000 | $380,000 | On Schedule | NEW |
| 268 | Mount Alifan Dr UUD (Genesee Av-Mt Evere - Street Light Design (7) | B13148 | Transportation | Design Bid Build | $82,400 | $103,000 | On Schedule | NEW |
| 269 | Emergency Slope Repairs at Orchard Avenue | 11003238 | Transportation | Design Bid Build | $6,000 | $20,000 | Awarded | NEW |
| 270 | Skyline Community Sign Rebuild | 21003567 | Transportation | Design Bid Build | $24,983 | $35,000 | Awarded | NEW |
| 271 | Beta Street Green Alley | 23426862 | Transportation | Design Bid Build | $315,165 | $495,000 | Awarded | NEW |
| 272 | Asphalt Overlay 1505 - JOC1 | B15177 | Transportation | Design Bid Build | $4,659,910 | $6,000,000 | Awarded | NEW |
| 273 | Asphalt Overlay 1506 - JOC2 | B15178 | Transportation | Design Bid Build | $4,803,092 | $6,000,000 | Awarded | NEW |
| 274 | Sidewalk Replacement Group 1501 | B15152 | Transportation | Design Bid Build | $699,750 | $967,000 | Awarded | NEW |
| 275 | 30th St PH 3A 20A | B00719 | Transportation | Design Bid Build | $260,425 | $289,361 | On Schedule | NEW |
| 276 | 30th St PH 3A 20A | B00719 | Transportation | Design Bid Build | $11,498 | $13,798 | Awarded | NEW |
| 277 | Girard @ Pearl A P S La Jolla DIF 13 | B13104 | Transportation | Design Bid Build | $136,407 | $210,500 | Awarded | NEW |
| 278 | Campanile Dr & Montezuma Rd Signal Mod | B13134 | Transportation | Design Bid Build | $100,100 | $155,200 | On Schedule | NEW |
| 279 | 4th Ave & Date St Traffic Signal | B13137 | Transportation | Design Bid Build | $214,589 | $275,000 | On Schedule | NEW |
| 280 | Pacific Beach 3 SL Circuit Upgrade | B13140 | Transportation | Design Bid Build | $825,063 | $1,013,063 | On Schedule | NEW |
| 281 | Sunset Cliffs 3 SL Circuit Upgrade | B13141 | Transportation | Design Bid Build | $696,900 | $1,003,500 | On Schedule | NEW |
| 282 | Grove Ave/Ingrid Ave@Hollister St TS | B13179 | Transportation | Design Bid Build | $266,000 | $349,500 | On Schedule | NEW |
| 283 | Callado Rd Green St Infiltration BMP | B13198 | Storm Water Drainage | Design Bid Build | $1,000,000 | $1,520,000 | On Schedule | NEW |
| 284 | Black Mountain & Park Village FY13 APS | B13207 | Transportation | Design Bid Build | $96,753 | $150,000 | Awarded | NEW |
| 285 | 31st St @ Ocean View Bl Traffic Signal | B14014 | Transportation | Design Bid Build | $211,541 | $275,000 | On Schedule | NEW |
| 286 | Beyer Bl @ Smythe Ave Traffic Signal | B14015 | Transportation | Design Bid Build | $235,900 | $320,000 | On Schedule | NEW |
| 287 | 41st St @ National Ave Traffic Signal | B14016 | Transportation | Design Bid Build | $221,541 | $285,000 | On Schedule | NEW |
| 288 | Alameda Place Emergency Storm Drain Replacement | B16048 | Transportation | Design Bid Build | $400,000 | $500,000 | Awarded | NEW |
| 289 | Monroe Ave - Winona to Collwood UUD | B00847 | Transportation | Design Bid Build | $45,000 | $56,618 | On Schedule | NEW |
| 290 | Pacific Beach DrCrwn Pt/Olney Sidewalk | B14020 | Transportation | Design Bid Build | $334,300 | $512,000 | On Schedule | NEW |
| 291 | Flashing Crosswalks Group 1501 | B15017 | Transportation | Design Bid Build | $402,000 | $580,000 | On Schedule | NEW |
| 292 | Camino del Sur Bike Path and Striping | S00955 | Transportation | Design Bid Build | $79,500 | $114,000 | On Schedule | NEW |
| 293 | Woodrow Avenue UUP | B15091 | Transportation | Design Bid Build | $35,000 | $65,000 | On Schedule | NEW |
| 294 | North Torrey Pines Road Bridge over Los Penasquitos Creek | S00935 | Transportation | Design Bid Build | $359,000 | $854,000 | On Schedule | NEW |
| 295 | District 4 Block 4AA UUD | B00826 | Transportation | Design Bid Build | $1,576,435 | $1,751,594 | On Schedule | NEW |
| 296 | District 2 Block 2-E UUD | B00709 | Transportation | Design Bid Build | $3,523,379 | $3,914,866 | On Schedule | NEW |
| 297 | Mission Hills/Presidio Circuit Upgrades | B15234 | Transportation | Design Bid Build | $480,000 | $480,000 | On Schedule | NEW |
Summary By Asset-managing Departments
When updated, this summary will show the latest amounts for those projects scheduled to be awarded in the current fiscal year and the first quarter of the next fiscal year.
| Asset-Managing Department | Estimated Construction Contract Award | Estimated Total Project Cost* |
|---|---|---|
| Airports | $5,179,161 | $7,763,308 |
| Environmental Services | $759,500 | $3,000,000 |
| Fire-Rescue | $35,689,071 | $51,241,669 |
| Library | $11,847,523 | $17,847,523 |
| Office of the Chief Operating Officer | $0 | $0 |
| Park & Recreation | $69,132,595 | $101,465,262 |
| Police | $1,276,192 | $2,932,653 |
| Public Utilities | $386,246,107 | $547,975,062 |
| Public Works - General Services | $14,177,374 | $25,908,260 |
| QUALCOMM Stadium | $488,107 | $884,000 |
| Special Promotional Programs | $0 | $0 |
| Transportation & Storm Water | $109,732,621 | $185,220,989 |
| Total Anticipated | $634,528,251 | $944,238,726 |
| Postponed | $53,568,698 | $79,429,865 |
| FY 2016 Total | $580,959,553 | $864,808,861 |