Forecast of Projects to be Awarded in Fiscal Year 2016 (First Quarter Update)
Data Date: October 1, 2015
This page contains all Capital Improvements Program (CIP) projects anticipated to be awarded for construction in the current fiscal year listed initially in the City's Adopted CIP budget. This page is updated throughout the year with the current cost estimates and new projects to list. It also identifies which projects were already awarded to a construction contractor. In addition, some projects from the original list may roll-over to the first quarter of next fiscal year and possibly beyond due to unforeseen conditions. See Construction Contract Types for more information about delivery methods. Also, visit Bid and Contract Opportunities for projects currently in the bid and award phase For more information about this report, call (619) 533-4207 or email engineering@sandiego.gov.
A summary by asset-managing departments is listed at the bottom of this page.
* To sort on a column, click on its heading. To sort on multiple columns, hold the Shift key while clicking.
Line Number |
Project Name |
Project Number |
Asset Managing Department |
Contract Type |
Estimated Contract Cost |
Estimated Total Project Cost |
Status | NEW |
---|---|---|---|---|---|---|---|---|
1 | Brown Field Airport Runway 8L/26R Rehab | B11010 | Airports | Design Bid Build | $3,900,000 | $5,865,308 | On Schedule | |
2 | Montgomery Field Airport Barrier Removal | B12073 | Airports | Design Bid Build | $415,000 | $602,359 | On Schedule | |
3 | Brown Field (SDM) Terminal ADA Upgrade | B12029 | Airports | Design Bid Build | $623,520 | $879,637 | Awarded | NEW |
4 | CNG Fueling Station for Refuse & Recycling | S15000 | Environmental Services | Design Build | $3,000,000 | $3,000,000 | On Schedule | |
5 | FIRE STA #5 - HILLCREST | S00788 | Fire-Rescue | Design Bid Build | $7,855,000 | $9,700,000 | On Schedule | |
6 | Fire Station #8 Mission Hills | S10029 | Fire-Rescue | Design Bid Build | $545,000 | $800,000 | On Schedule | |
7 | Fire Station 15 Expansion | S13011 | Fire-Rescue | Design Bid Build | $375,000 | $565,000 | On Schedule | |
8 | FIRE STATION NO. 17 | S00783 | Fire-Rescue | Design Bid Build | $8,748,624 | $12,028,624 | On Schedule | |
9 | FIRE STATION 22 - POINT | S00787 | Fire-Rescue | Design Bid Build | $5,471,000 | $7,273,800 | On Schedule | |
10 | Mission Hills - Hillcrest Library | S13022 | Library | Design Build | $11,847,523 | $17,847,523 | On Schedule | |
11 | Balboa Park GC Fuel Tank Installation | B12019 | Park & Recreation | Design Bid Build | $322,000 | $514,000 | On Schedule | |
12 | Orchard Av, Capri by Sea & Old Salt Pool | B14073 | Park & Recreation | Design Bid Build | $205,870 | $360,870 | On Schedule | |
13 | Angier Elementary School Joint Use | S00762 | Park & Recreation | Design Bid Build | $1,757,126 | $2,207,000 | Awarded | |
14 | California Tower Seismic Retrofit | L12003 | Park & Recreation | Design Bid Build | $1,011,000 | $3,275,612 | On Schedule | |
15 | Canyonside Community Park Improvements | S12004 | Park & Recreation | Design Bid Build | $710,540 | $999,833 | On Schedule | |
16 | Del Mar Mesa Neighborhood Park Phase II | S13023 | Park & Recreation | Design Bid Build | $1,440,354 | $2,060,354 | On Schedule | |
17 | Larsen Field ADA Improvements Phase II | S13004 | Park & Recreation | Design Bid Build | $1,127,064 | $1,691,717 | On Schedule | |
18 | Linda Vista Skate Park | S15008 | Park & Recreation | Design Bid Build | $1,740,000 | $3,040,000 | On Schedule | |
19 | Park de la Cruz Neighborhood Park Improv | S15003 | Park & Recreation | Design Bid Build | $6,818,102 | $10,297,708 | On Schedule | |
20 | MISSION BAY GOLF COURSE PRACTICE CENTER | S01090 | Park & Recreation | Design Bid Build | $963,882 | $1,400,000 | On Schedule | |
21 | Mission Bay Golf Course Renovation & Recon | S11010 | Park & Recreation | Design Bid Build | $2,100,000 | $2,960,000 | On Schedule | |
22 | Mountain View NP Area Upgrades | S11019 | Park & Recreation | Design Bid Build | $810,000 | $1,638,086 | Awarded | |
23 | North Park/Main St Sidewalk Improvements | S10040 | Park & Recreation | Design Bid Build | $261,714 | $385,000 | On Schedule | |
24 | Pacific Breezes (Ocean View Hills) CP | S00649 | Park & Recreation | Design Bid Build | $11,200,000 | $16,800,000 | On Schedule | |
25 | Pomerado Median Improve-N of R Bernardo | S10035 | Park & Recreation | Design Bid Build | $649,995 | $899,840 | On Schedule | |
26 | Rancho Penasquitos Towne Centre Park Imp | S12003 | Park & Recreation | Design Bid Build | $118,500 | $175,000 | On Schedule | |
27 | RIVIERA DEL SOL NEIGHBORHOOD PARK | S00999 | Park & Recreation | Design Bid Build | $4,224,204 | $6,924,640 | On Schedule | |
28 | SD River Dredging Qualcomm Way to SR163 | S00606 | Park & Recreation | Design Bid Build | $739,000 | $1,064,000 | On Schedule | |
29 | Silver Wing Neighborhd Pk Spts Fld & Lgt | S11051 | Park & Recreation | Design Bid Build | $212,350 | $316,000 | On Schedule | |
30 | Tierrasanta CP Sports Field Lighting | S11011 | Park & Recreation | Design Bid Build | $705,319 | $1,050,876 | Awarded | |
31 | Torrey Highlands Community ID and Enhnce | S11009 | Park & Recreation | Design Bid Build | $140,000 | $325,000 | On Schedule | |
32 | Torrey Meadows Neighborhood Park | S00651 | Park & Recreation | Design Bid Build | $3,683,300 | $7,922,755 | On Schedule | |
33 | Torrey Pines N. Golf Course-Improvements | S14019 | Park & Recreation | Design Build | $12,600,000 | $14,170,000 | On Schedule | |
34 | Trail For All People | S13001 | Park & Recreation | Design Bid Build | $238,500 | $511,000 | Awarded | |
35 | University Village Park Tot Lot | S13005 | Park & Recreation | Design Bid Build | $307,500 | $450,000 | On Schedule | |
36 | Webster Neighborhood Identification Sign | S14005 | Park & Recreation | Design Bid Build | $10,000 | $40,000 | On Schedule | |
37 | West Maple Canyon MP | S00760 | Park & Recreation | Design Bid Build | $426,000 | $1,037,630 | On Schedule | |
38 | WIGHTMAN STREET NEIGHBORHOOD PARK | S00767 | Park & Recreation | Design Bid Build | $2,250,000 | $3,186,000 | On Schedule | |
39 | Mira Mesa Community Park Expansion Phase 1B | S00667 | Park & Recreation | Design Build | $3,400,000 | $15,027,240 | On Schedule | NEW |
40 | Police HQs CoGeneration Repower Project | S10131 | Police | Design Bid Build | $376,192 | $983,085 | Awarded | |
41 | Police Range Refurbishment | S10118 | Police | Design Bid Build | $900,000 | $1,078,000 | On Schedule | |
42 | Hodges Resv Hypolimnetic Oxygenation Sys | B15195 | Public Utilities | Design Build | $2,792,051 | $3,600,000 | On Schedule | |
43 | MBC Chemical System Improvements Phase 2 | B10178 | Public Utilities | Design Bid Build | $2,000,000 | $6,090,354 | Awarded | |
44 | SBWRP Sludge Pump & Grinder Installation | B14167 | Public Utilities | Design Bid Build | $392,500 | $789,000 | On Schedule | |
45 | ROSE CANYON TS (RCTS) JOINT REPAIR | B11025 | Public Utilities | Design Bid Build | $5,671,800 | $6,233,000 | On Schedule | |
46 | S Mission Valley TS Accelerated Project | B14068 | Public Utilities | Design Bid Build | $315,000 | $600,000 | On Schedule | |
47 | Sorrento Mesa Recycled Water PL | B15080 | Public Utilities | Design Build | $2,297,400 | $2,837,000 | Awarded | |
48 | Citywide Manhole Improvements | B13177 | Public Utilities | Design Bid Build | $242,198 | $440,000 | Awarded | |
49 | Otay Valley Manhole Improvements Phase 2 | B14155 | Public Utilities | Design Bid Build | $1,709,833 | $3,226,120 | Awarded | |
50 | Pipeline Rehab Phase J-2 (Laterals) | B11061 | Public Utilities | Design Bid Build | $2,700,000 | $8,799,999 | Awarded | |
51 | Pipeline Rehabilitation AC1 | B14008 | Public Utilities | Design Bid Build | $4,589,000 | $5,596,000 | On Schedule | |
52 | Pipeline Rehabilitation AD-1 | B14009 | Public Utilities | Design Bid Build | $5,816,500 | $7,423,500 | On Schedule | |
53 | Pipeline Rehabilitation AF1 | B14125 | Public Utilities | Design Bid Build | $5,070,000 | $6,720,000 | On Schedule | |
54 | Pipeline Rehabilitantion AG1 | B14118 | Public Utilities | Design Bid Build | $4,417,000 | $5,437,000 | On Schedule | |
55 | Pipeline Rehabilitation AH-1B | B15146 | Public Utilities | Design Bid Build | $4,330,607 | $6,296,450 | Awarded | |
56 | Pipeline Rehabilitation Z-1A | B14110 | Public Utilities | Design Bid Build | $4,335,200 | $5,559,700 | On Schedule | |
57 | SPS 13 14 16 25A & 85 Dual FM | B00501 | Public Utilities | Design Bid Build | $944,000 | $1,495,000 | On Schedule | |
58 | SPS 23T - Reliability Improvements | B14131 | Public Utilities | Design Bid Build | $661,000 | $1,074,000 | On Schedule | |
59 | SPS 76 Generator | B14168 | Public Utilities | Design Bid Build | $41,500 | $75,000 | On Schedule | |
60 | Penasquitos Creek Park RW Retrofit | B14143 | Public Utilities | Design Bid Build | $48,900 | $121,500 | Awarded | |
61 | AC Water & Sewer Group 1014 (S) | B15079 | Public Utilities | Design Bid Build | $263,900 | $387,800 | On Schedule | |
62 | Buchanan Canyon Sewer B (UP) | B00429 | Public Utilities | Design Bid Build | $3,487,493 | $4,894,396 | On Schedule | |
63 | PACIFIC BEACH PIPELINE SOUTH (S) | B12117 | Public Utilities | Design Bid Build | $2,110,000 | $2,788,500 | On Schedule | |
64 | Sewer & AC Water Group 752 (S) | B00360 | Public Utilities | Design Bid Build | $1,956,000 | $4,105,815 | Awarded | |
65 | Sewer & Water Group 701 | B00452 | Public Utilities | Design Bid Build | $4,571,000 | $5,987,600 | On Schedule | |
66 | Sewer & AC Water Group 785 (S) | B00383 | Public Utilities | Design Bid Build | $3,784,000 | $5,813,500 | On Schedule | |
67 | Sewer GJ 827 | B00436 | Public Utilities | Design Bid Build | $5,747,751 | $6,754,948 | On Schedule | |
68 | Sewer and Water Group 834 (S) | B13099 | Public Utilities | Design Bid Build | $3,098,614 | $3,964,912 | On Schedule | |
69 | SEWER GJ 798C | B00409 | Public Utilities | Design Bid Build | $212,420 | $484,380 | On Schedule | |
70 | Sewer Group 721 | B00460 | Public Utilities | Design Bid Build | $3,723,351 | $4,878,277 | On Schedule | |
71 | Sewer Group 767A | B11077 | Public Utilities | Design Bid Build | $4,783,949 | $5,463,186 | Awarded | |
72 | SEWER GROUP 798 | B00399 | Public Utilities | Design Bid Build | $1,247,000 | $2,371,440 | Awarded | |
73 | Sewer Group 839 | B14070 | Public Utilities | Design Bid Build | $315,500 | $500,000 | On Schedule | |
74 | Tecolote Canyon 8-inch CI Sewer Replacement | B11111 | Public Utilities | Design Bid Build | $600,000 | $912,811 | On Schedule | |
75 | Tyrian St/Soledad Ave Sewer Main Replace | B12111 | Public Utilities | Design Bid Build | $915,000 | $1,346,500 | On Schedule | |
76 | Water & Sewer GJ 816 (S) | B00443 | Public Utilities | Design Build | $200,000 | $1,290,813 | Awarded | |
77 | Water & Sewer Group 954 (S) | B13203 | Public Utilities | Design Bid Build | $458,700 | $666,200 | On Schedule | |
78 | Water & Sewer Group 965 (S) | B12048 | Public Utilities | Design Bid Build | $2,182,900 | $2,932,600 | On Schedule | |
79 | La Jolla Country Club Reservoir | B11024 | Public Utilities | Design Bid Build | $4,534,250 | $6,782,000 | On Schedule | |
80 | False Bay RR Trunk Sewer | B00507 | Public Utilities | Design Bid Build | $1,026,011 | $1,424,841 | On Schedule | |
81 | Manning Cyn Swr and Wtr Replacement (S) | B00504 | Public Utilities | Design Bid Build | $5,642,368 | $7,228,461 | On Schedule | |
82 | MOC 5 Materials Bins | B14133 | Public Utilities | Design Bid Build | $570,000 | $760,000 | On Schedule | |
83 | AC Water & Sewer Group 1014 (W) | B15078 | Public Utilities | Design Bid Build | $3,197,800 | $4,692,600 | On Schedule | |
84 | AC Water Group 1007 | B15036 | Public Utilities | Design Bid Build | $2,300,000 | $3,330,000 | On Schedule | |
85 | Manning Cyn Swr and Wtr Replacement (W) | B00095 | Public Utilities | Design Bid Build | $589,072 | $872,910 | On Schedule | |
86 | Meadow Lark Dr/Health Ctr Dr Water Main | B15105 | Public Utilities | Design Build | $4,645,000 | $6,860,000 | On Schedule | |
87 | Sewer & AC Water Group 752 (W) | B15058 | Public Utilities | Design Bid Build | $509,000 | $618,000 | Awarded | |
88 | Sewer & AC Water Group 785 (W) | B13208 | Public Utilities | Design Bid Build | $1,074,000 | $1,575,500 | On Schedule | |
89 | Sewer and AC Water Group 834 (W) | B14141 | Public Utilities | Design Bid Build | $2,223,813 | $2,879,319 | On Schedule | |
90 | Sewer & Water Group 701 | B00039 | Public Utilities | Design Bid Build | $241,000 | $322,400 | On Schedule | |
91 | Sewer and AC Water Group 827 (W) | B15066 | Public Utilities | Design Bid Build | $1,177,250 | $1,252,250 | On Schedule | |
92 | USD Water Main Replacement - Phase II | B15204 | Public Utilities | Design Bid Build | $850,000 | $1,600,000 | On Schedule | |
93 | Water & Sewer Group Job 954 (W) | B10187 | Public Utilities | Design Bid Build | $1,404,000 | $2,049,400 | On Schedule | |
94 | Water & Sewer Group 965 (W) | B12057 | Public Utilities | Design Bid Build | $2,081,600 | $2,934,600 | On Schedule | |
95 | Water Group Job 942 | B11038 | Public Utilities | Design Bid Build | $3,496,894 | $4,596,000 | Awarded | |
96 | College Ranch Hydro Pump Station | B11023 | Public Utilities | Design Bid Build | $7,233,980 | $9,189,190 | On Schedule | |
97 | Bayview Reservoir Solar Project | S14021 | Public Utilities | Design Build | $2,057,500 | $2,325,000 | On Schedule | |
98 | Chollas Building | S11025 | Public Utilities | Design Build | $17,500,000 | $22,500,000 | On Schedule | |
99 | EMTS Boat Dock and Steam Line Relocation | S00319 | Public Utilities | Design Bid Build | $1,547,325 | $2,018,535 | On Schedule | |
100 | Lower Otay Reservior Emerg Outlet Improv | S00044 | Public Utilities | Design Bid Build | $1,725,930 | $3,146,971 | On Schedule | |
101 | MBC ODOR CONTROL FACILITY UPGRADES | S00323 | Public Utilities | Design Bid Build | $4,999,722 | $7,575,793 | On Schedule | |
102 | Miramar Clearwell Improvements | S11024 | Public Utilities | Design Bid Build | $97,162,485 | $114,728,744 | On Schedule | |
103 | MOC Complex Solar Project | S14022 | Public Utilities | Design Build | $2,372,500 | $2,675,000 | On Schedule | |
104 | PACIFIC BEACH PIPELINE SOUTH (W) | S12015 | Public Utilities | Design Bid Build | $20,985,032 | $27,516,758 | On Schedule | |
105 | PS2 Power Reliability & Surge Protection | S00312 | Public Utilities | Design Bid Build | $34,300,000 | $43,330,000 | On Schedule | |
106 | Tierrasanta (Via Dominique) Pump Station | S12040 | Public Utilities | Design Bid Build | $13,251,833 | $16,688,861 | On Schedule | |
107 | Upas St Pipeline Replacement | S11022 | Public Utilities | CMAR | $11,223,890 | $32,184,000 | Awarded | |
108 | Water & Sewer Group Job 816 (W) | S13015 | Public Utilities | Design Build | $300,000 | $10,755,363 | Awarded | |
109 | WDSU - Reservoirs & Dams - Ph II | S11106 | Public Utilities | Design Build | $2,680,000 | $3,480,000 | On Schedule | |
110 | Pipeline Rehabilitation Z-1 | B13209 | Public Utilities | Design Bid Build | $1,299,108 | $1,685,107 | Awarded | NEW |
111 | North City Water Reclamation Plant Sludge Pump Upgrade | S00309 | Public Utilities | Design Bid Build | $430,259 | $636,294 | Awarded | NEW |
112 | Recycled Water Tank Modifications | S12014 | Public Utilities | Design Build | $1,036,993 | $1,300,000 | Awarded | NEW |
113 | Sewer and Water Group 840 | B15113/ B15114 | Public Utilities | Design Bid Build | $841,328 | $1,150,125 | Awarded | NEW |
114 | Sewer and Water AC Group 778 (S) | B00388 | Public Utilities | Design Bid Build | $8,938,755 | $10,589,161 | On Schedule | NEW |
115 | Sewer & Water GJ Crown Pt s La Playa (S) | B10210 | Public Utilities | Design Bid Build | $7,000,000 | $7,782,303 | On Schedule | NEW |
116 | Sewer & Water GJ Crown Pt s La Playa (W) | B13011 | Public Utilities | Design Bid Build | $1,804,638 | $2,674,476 | On Schedule | NEW |
117 | Pipeline Rehabilitation AE-1 | B14030 | Public Utilities | Design Bid Build | $5,789,162 | $7,059,149 | On Schedule | NEW |
118 | AC Water Group 1008 | B14117 | Public Utilities | Design Bid Build | $3,108,000 | $4,144,000 | On Schedule | NEW |
119 | Sewer and AC Water Group 778 (W) | B15069 | Public Utilities | Design Bid Build | $7,832,801 | $10,461,301 | On Schedule | NEW |
120 | AC Water Group 1028 | B15122 | Public Utilities | Design Bid Build | $5,054,700 | $7,414,100 | On Schedule | NEW |
121 | La Jolla Scenic Drive Pipeline (S) | B15176 | Public Utilities | Design Build | $406,400 | $575,100 | On Schedule | NEW |
122 | La Jolla Scenic Dr 16in main | S12009 | Public Utilities | Design Build | $5,900,600 | $8,280,800 | On Schedule | NEW |
123 | Water Group 955A | B15233 | Public Utilities | Design Bid Build | $2,510,208 | $3,674,648 | On Schedule | NEW |
124 | Emergency Strobe Lights at MBC, SB | B13227 A | Public Utilities | Design Bid Build | $300,000 | $400,000 | Awarded | NEW |
125 | Emergency Strobe Lights at NC | B13227 B | Public Utilities | Design Bid Build | $265,000 | $354,000 | On Schedule | NEW |
126 | PS 2 Emergency Generators | B16015 | Public Utilities | Design Build | $2,043,243 | $2,700,000 | On Schedule | NEW |
127 | Chollas Material Bins | S15043 | Public Utilities | Design Build | $800,000 | $1,200,000 | On Schedule | NEW |
128 | El Cuervo Del Sur Wetlands Mitigation | 21003730 | Public Utilities | Design Bid Build | $569,465 | $569,465 | Awarded | NEW |
129 | South Chollas Wash Replacement | B14128 | Public Utilities | Design Bid Build | $399,993 | $500,000 | Awarded | NEW |
130 | 67th b/s El Cajon to Richard Bond MS DS | B13061 | Public Works - General Services | Design Bid Build | $153,470 | $248,000 | Awarded | |
131 | Alzheimer Family Center ADA Improvements | B12074 | Public Works - General Services | Design Bid Build | $280,000 | $624,300 | Awarded | |
132 | Barrio Youth Facilities 2 & 3 | B13067 | Public Works - General Services | Design Bid Build | $492,820 | $792,680 | On Schedule | |
133 | Bay Bridge Community Center ADA | B13076 | Public Works - General Services | Design Bid Build | $304,000 | $608,000 | On Schedule | |
134 | Carmel Creek Park Comft St ADA Access Im | B14153 | Public Works - General Services | Design Bid Build | $159,185 | $234,000 | On Schedule | |
135 | Carmel Del Mar Comft St ADA Access Impro | B14154 | Public Works - General Services | Design Bid Build | $317,200 | $431,000 | On Schedule | |
136 | Carmel Valley Rec Ctr ADA Access Impr | B14152 | Public Works - General Services | Design Bid Build | $269,437 | $410,300 | On Schedule | |
137 | City Heights Youth & Community Center AD | B13068 | Public Works - General Services | Design Bid Build | $238,000 | $523,000 | On Schedule | |
138 | Colina Del Sol Pool ADA | B13077 | Public Works - General Services | Design Bid Build | $480,960 | $800,000 | On Schedule | |
139 | El Cajon & 59th Obstruction DIF CR DS | B13105 | Public Works - General Services | Design Bid Build | $152,584 | $211,648 | On Schedule | |
140 | Euclid W/S Federal Bl Marilou Bond MS DS | B13060 | Public Works - General Services | Design Bid Build | $112,000 | $150,000 | On Schedule | |
141 | Golden Hill CR Obstruction DIF 14 | B14052 | Public Works - General Services | Design Bid Build | $75,700 | $185,200 | On Schedule | |
142 | Group Job 13F Linda Vista DIF CR | B13108 | Public Works - General Services | Design Bid Build | $89,000 | $123,000 | On Schedule | |
143 | Group Job 13H Midway-Pacific DIF DS | B13110 | Public Works - General Services | Design Bid Build | $124,990 | $270,300 | Awarded | |
144 | Group Job 13I North Park DIF CR | B13111 | Public Works - General Services | Design Bid Build | $308,700 | $466,800 | On Schedule | |
145 | Group Job 13J Peninsula DIF CR | B13112 | Public Works - General Services | Design Bid Build | $261,200 | $404,800 | On Schedule | |
146 | Mission Beach Community Center | B12004 | Public Works - General Services | Design Bid Build | $116,655 | $142,915 | Awarded | |
147 | Mission Beach Obstruction DIF 13 CR | B13125 | Public Works - General Services | Design Bid Build | $169,850 | $245,000 | On Schedule | |
148 | Orange & Altadena CR Obstruction DS | B13072 | Public Works - General Services | Design Bid Build | $95,070 | $127,000 | Awarded | |
149 | Santa Clara Recreation Center - ADA | B12006 | Public Works - General Services | Design Bid Build | $840,000 | $1,149,241 | On Schedule | |
150 | SY Comm and Rec CTR-ADA Barrier Removal | B13078 | Public Works - General Services | Design Bid Build | $596,200 | $1,040,000 | On Schedule | |
151 | Air & Space Museum Elev Modernization | B10035 | Public Works - General Services | Design Build | $353,123 | $433,123 | On Schedule | |
152 | Fire Station 14 Roof & HVAC Replacement | B13189 | Public Works - General Services | Design Bid Build | $501,000 | $755,000 | On Schedule | |
153 | Fire Station 19 Roof & HVAC Replacement | B13190 | Public Works - General Services | Design Bid Build | $666,500 | $1,000,000 | On Schedule | |
154 | Fire Station 3 Improvements | B13187 | Public Works - General Services | Design Bid Build | $410,000 | $645,700 | On Schedule | |
155 | Malcolm X Library Facility Repairs | B10038 | Public Works - General Services | Design Bid Build | $516,800 | $717,000 | On Schedule | |
156 | Museum of Art Elevator Modernization | B10042 | Public Works - General Services | Design Build | $919,293 | $1,130,293 | On Schedule | |
157 | Fleet Servs Elect & Fac Impvts. | L14002 | Public Works - General Services | Design Bid Build | $282,500 | $713,000 | On Schedule | |
158 | Sunset Cliffs Hillside Improvements Phase 1A | S10091 | Public Works - General Services | Design Bid Build | $201,700 | $370,700 | Awarded | NEW |
159 | Siva & Main CR Obstruction | B14053 | Public Works - General Services | Design Bid Build | $96,530 | $244,804 | Awarded | NEW |
160 | Pioneer Park & Comfort Station - ADA | B12005 | Public Works - General Services | Design Build | $342,618 | $535,086 | On Schedule | NEW |
161 | Southeastern Obstruction DIF 13 CR | B13106 | Public Works - General Services | Design Bid Build | $169,000 | $262,000 | On Schedule | NEW |
162 | Old Globe Theater Elevator Modernization | B10045 | Public Works - General Services | Design Build | $597,622 | $744,622 | On Schedule | NEW |
163 | Former Valencia Park Library (101 50th Street) Demolition - Civic SD | 24005705 | Public Works - General Services | Design Bid Build | $106,578 | $383,018 | Awarded | NEW |
164 | Lyceum Theatre Renovation - Civic SD | 24005563 | Public Works - General Services | Design Bid Build | $2,918,000 | $3,437,500 | Awarded | NEW |
165 | Qualcomm Stdm Concrete Spalling | B15027 | QUALCOMM Stadium | Design Bid Build | $146,000 | $224,000 | On Schedule | |
166 | Qualcomm Stdm Fiber Optic & CATV | B14071 | QUALCOMM Stadium | Design Build | $335,000 | $500,000 | On Schedule | |
167 | Qualcomm Stdm Elevator Modernization | B15000 | QUALCOMM Stadium | Design Bid Build | $131,000 | $160,000 | On Schedule | NEW |
168 | Replace Barrier Rail on Barnett o/PCH | B00869 | Transportation & Storm Water | Design Bid Build | $322,682 | $613,000 | Awarded | |
169 | Burroughs & W Dunlop Sts Storm Dr Repl | B13101 | Transportation & Storm Water | Design Bid Build | $492,929 | $860,561 | On Schedule | |
170 | Cardinal Dr (2383) Storm Drain Replacemt | B12025 | Transportation & Storm Water | Design Bid Build | $488,000 | $750,000 | On Schedule | |
171 | Hornblend Alley(1761)Storm Drain Upgrade | B12035 | Transportation & Storm Water | Design Bid Build | $362,000 | $550,000 | On Schedule | |
172 | Industrial Ct Channel Replacement | B13118 | Transportation & Storm Water | Design Bid Build | $222,000 | $400,000 | On Schedule | |
173 | Jean Drive Storm Drain Replacement | B11013 | Transportation & Storm Water | Design Bid Build | $390,000 | $745,000 | On Schedule | |
174 | Langmuir St (2252) SD Replacement | B12091 | Transportation & Storm Water | Design Bid Build | $232,680 | $900,000 | On Schedule | |
175 | Whitney Ct (6969) Storm Drain Replacement | B13210 | Transportation & Storm Water | Design Bid Build | $228,000 | $419,000 | On Schedule | |
176 | 70th St, Pso Lucido & San Ysidro St Lts | B14064 | Transportation & Storm Water | Design Bid Build | $187,171 | $193,600 | Awarded | |
177 | City Street Lights - 25 Locations | B14106 | Transportation & Storm Water | Design Bid Build | $184,600 | $275,300 | On Schedule | |
178 | New Streetlights - 19 Locations | B14012 | Transportation & Storm Water | Design Bid Build | $282,450 | $389,200 | On Schedule | |
179 | Mission BlVentura/Sn Fernando Pocket | B14093 | Transportation & Storm Water | Design Bid Build | $152,200 | $294,814 | On Schedule | |
180 | University Ave-Winona to 50th Median | B13093 | Transportation & Storm Water | Design Bid Build | $328,000 | $523,000 | On Schedule | |
181 | N Harbor Dr Pedestrian Access Improvmnts | B12060 | Transportation & Storm Water | Design Bid Build | $637,600 | $919,700 | On Schedule | |
182 | 31st St & Market St School Traffic Sgnal | B15014 | Transportation & Storm Water | Design Bid Build | $192,000 | $275,000 | On Schedule | |
183 | 38th at Wightman Pop-outs | B13087 | Transportation & Storm Water | Design Bid Build | $409,500 | $594,000 | On Schedule | |
184 | 60th St and Vale Way Traffic Circle | B14056 | Transportation & Storm Water | Design Bid Build | $180,000 | $283,000 | On Schedule | |
185 | C Street-Park to 16th-Ped Improvements | B15019 | Transportation & Storm Water | Design Bid Build | $200,000 | $300,000 | On Schedule | |
186 | Orange Av btwn 49 & Winona Xwlk/Chkrs | B12080 | Transportation & Storm Water | Design Bid Build | $271,000 | $351,000 | On Schedule | |
187 | 36th St & El Cajon Bl Traffic Signal | B13138 | Transportation & Storm Water | Design Bid Build | $252,993 | $330,000 | On Schedule | |
188 | 3rd Ave @ Washington St Traffic Signal | B14062 | Transportation & Storm Water | Design Bid Build | $303,200 | $395,100 | On Schedule | |
189 | Division St & Osborn St Traffic Signal | B15047 | Transportation & Storm Water | Design Bid Build | $212,200 | $275,000 | On Schedule | |
190 | Division St @ Valencia Pky TS | B15008 | Transportation & Storm Water | Design Bid Build | $232,155 | $301,000 | On Schedule | |
191 | Traffic Signal Upgrades Citywide FY14 | B14048 | Transportation & Storm Water | Design Bid Build | $626,700 | $814,400 | On Schedule | |
192 | 28th Street UUD (Island Av - Clay St) - Street Light Design (14) | B13156 | Transportation & Storm Water | Design Bid Build | $100,800 | $126,000 | On Schedule | |
193 | 30th Street Phase III Broadway to K UUD - Street Light Design (14) | B00717 | Transportation & Storm Water | Design Bid Build | $141,000 | $651,000 | On Schedule | |
194 | 32nd Street UUD (Market St - F St) - Street Light Design (5) | B13144 | Transportation & Storm Water | Design Bid Build | $36,000 | $45,000 | On Schedule | |
195 | Altadena/Wightman/Winona-El Cajon UUD - Street Light Design (28) | B00850 | Transportation & Storm Water | Design Bid Build | $227,000 | $495,000 | On Schedule | |
196 | Block 1M UUD (La Jolla 4) - Street Light Design (44) | B13151 | Transportation & Storm Water | Design Bid Build | $316,800 | $396,000 | On Schedule | |
197 | Block 2S1 South Mission Beach UUD | B12067 | Transportation & Storm Water | Design Bid Build | $302,400 | $378,000 | On Schedule | |
198 | Block 4-J1 UUD (Mid City) - Street Light Design (45) | B13152 | Transportation & Storm Water | Design Bid Build | $324,000 | $405,000 | On Schedule | |
199 | Block 6DD1 UUD (Clairemont Mesa) - Street Light Design (61) | B13153 | Transportation & Storm Water | Design Bid Build | $439,200 | $549,000 | On Schedule | |
200 | Block 7O1 UUD (College Area) - Street Light Design (54) | B13154 | Transportation & Storm Water | Design Bid Build | $388,800 | $486,000 | On Schedule | |
201 | Block 7R Allied Gardens UUD | B12064 | Transportation & Storm Water | Design Bid Build | $357,319 | $422,802 | Awarded | |
202 | Block 8A Golden Hill UUD | B12056 | Transportation & Storm Water | Design Bid Build | $168,984 | $207,156 | Awarded | |
203 | Block 8C UUD (Greater Golden Hill) - Street Light Design (48) | B13155 | Transportation & Storm Water | Design Bid Build | $345,600 | $432,000 | On Schedule | |
204 | Cardiff Street UUD (Carlisle Dr-Wade St) - Street Light Design (6) | B13145 | Transportation & Storm Water | Design Bid Build | $48,000 | $60,000 | On Schedule | |
205 | District 7 Block 7-A UUD - Street Light Design (79) | B00842 | Transportation & Storm Water | Design Bid Build | $470,000 | $771,000 | On Schedule | |
206 | District 8 Block 8-B UUD - Street Light Design (41) | B00841 | Transportation & Storm Water | Design Bid Build | $441,000 | $1,187,664 | On Schedule | |
207 | Euclid Ave UUD SLs (Euclid-Univ) - Street Light Design (23) | B11131 | Transportation & Storm Water | Design Bid Build | $150,000 | $216,000 | On Schedule | |
208 | FANUEL ST PI Archer to Tourmaline UUD | B00721 | Transportation & Storm Water | Design Bid Build | $65,638 | $82,047 | On Schedule | |
209 | Fanuel Street Phase II Grand to Reed UUD - Street Light Design (13) | B00722 | Transportation & Storm Water | Design Bid Build | $104,000 | $130,000 | On Schedule | |
210 | Howard Avenue UUD (Park Bl-I-805) - Street Light Design (16) | B13146 | Transportation & Storm Water | Design Bid Build | $266,400 | $333,000 | On Schedule | |
211 | Illion Street UUD (Gardena Av-Milton St) - Street Light Design (6) | B13147 | Transportation & Storm Water | Design Bid Build | $43,200 | $54,000 | On Schedule | |
212 | Lincoln Av UUD (30th St-Wabash Av) - Street Light Design (5) | B12066 | Transportation & Storm Water | Design Bid Build | $330,000 | $651,000 | On Schedule | |
213 | Moraga Ave-Balboa Ave to Elisinore UUD - Street Light Design (19) | B00788 | Transportation & Storm Water | Design Bid Build | $237,000 | $439,782 | On Schedule | |
214 | Paradise Valley Rd UUD (Potomac St-Parkl - Street Light Design (1) | B13149 | Transportation & Storm Water | Design Bid Build | $23,200 | $29,000 | On Schedule | |
215 | Potomac UUD Calle Tres Lomas-Sea Breeze - Street Light Design (13) | B12069 | Transportation & Storm Water | Design Bid Build | $94,000 | $459,000 | On Schedule | |
216 | San Vicente Street to Ashmore UUD - Street Light Design (6) | B00725 | Transportation & Storm Water | Design Bid Build | $120,000 | $267,414 | Awarded | |
217 | Sunset Cliffs-Coronado to Newport UUD - Street Light Design (5) | B00720 | Transportation & Storm Water | Design Bid Build | $306,000 | $355,500 | On Schedule | |
218 | Trojan Ave 56th to 60th UUD - Street Light Design (8) | B00718 | Transportation & Storm Water | Design Bid Build | $80,000 | $120,000 | Awarded | |
219 | Beta Street and 37th Street Green Alley | B11057 | Transportation & Storm Water | Design Bid Build | $585,100 | $768,815 | On Schedule | |
220 | Maple Canyon Restoration - Phase 1 | B12040 | Transportation & Storm Water | Design Bid Build | $2,636,000 | $4,307,400 | On Schedule | |
221 | 34th & 35th @ Madison Ave Improvements | S00922 | Transportation & Storm Water | Design Bid Build | $523,488 | $1,430,854 | Awarded | |
222 | Alta La Jolla Drive Drainage Repair Phase II | S10001 | Transportation & Storm Water | Design Bid Build | $3,820,704 | $6,206,105 | Awarded | |
223 | Azalea Park Artistic Enhancement | S00700 | Transportation & Storm Water | Design Bid Build | $73,000 | $411,830 | Awarded | |
224 | Carmel Country Road Low Flow Channel | S00969 | Transportation & Storm Water | Design Bid Build | $812,300 | $1,842,800 | On Schedule | |
225 | Cherokee Street Improvements | S00921 | Transportation & Storm Water | Design Bid Build | $899,950 | $1,986,005 | Awarded | |
226 | Coolidge Street Storm Drain | S11003 | Transportation & Storm Water | Design Bid Build | $212,500 | $469,000 | Awarded | |
227 | El Camino Real/SR-56 Bike Path Connector | S00981 | Transportation & Storm Water | Design Bid Build | $169,998 | $545,340 | Awarded | |
228 | Five Points Neighborhood Pedestrian Improvements | S00988 | Transportation & Storm Water | Design Bid Build | $315,000 | $725,000 | On Schedule | |
229 | Georgia Street Bridge Improvements | S00863 | Transportation & Storm Water | Design Bid Build | $7,360,459 | $14,375,795 | On Schedule | |
230 | La Jolla Mesa Drive Sidewalk | S00928 | Transportation & Storm Water | Design Bid Build | $585,900 | $837,000 | On Schedule | |
231 | Mission Beach Boardwalk Bulkhead | S00726 | Transportation & Storm Water | Design Bid Build | $2,174,347 | $3,792,225 | Awarded | |
232 | Old Otay Mesa Road-Westerly | S00870 | Transportation & Storm Water | Design Bid Build | $8,953,830 | $11,536,671 | Awarded | |
233 | Pacific Beach Curb Ramp/Barrier Removal | S11048 | Transportation & Storm Water | Design Bid Build | $169,850 | $246,000 | On Schedule | |
234 | Pacific Hwy Curb Ramp Barrier Removal | S11045 | Transportation & Storm Water | Design Bid Build | $194,630 | $450,000 | Awarded | |
235 | Palm Avenue Roadway Improvements | S00913 | Transportation & Storm Water | Design Bid Build | $3,239,867 | $4,617,209 | On Schedule | |
236 | Regents Rd Widening-Genesee to Executive | S00881 | Transportation & Storm Water | Design Bid Build | $3,900,000 | $6,623,209 | On Schedule | |
237 | SR163/Friars Road | S00851 | Transportation & Storm Water | Design Bid Build | $26,300,000 | $45,566,000 | On Schedule | |
238 | Streamview Drive Improvements | S00864 | Transportation & Storm Water | Design Bid Build | $2,528,695 | $3,505,000 | Awarded | |
239 | Torrey Pines Road Slope Restoration | S00877 | Transportation & Storm Water | Design Bid Build | $1,800,000 | $2,831,576 | On Schedule | |
240 | UUD District 1 Block 1-F | B00708/ B00710/ B00711/ B00825 | Transportation & Storm Water | Design Bid Build | $767,200 | $767,200 | Awarded | NEW |
241 | Kensington Manor No. 1 Streetlight Circuit Upgrade | B00863 | Transportation & Storm Water | Design Bid Build | $615,653 | $900,000 | Awarded | NEW |
242 | District 2 Block 2-T UUD | B00835 | Transportation & Storm Water | Design Bid Build | $72,422 | $907,928 | Awarded | NEW |
243 | UUP Sherman Heights Street Resurfacing | B00829/ B00714/ B00851/ B00705 | Transportation & Storm Water | Design Bid Build | $1,773,200 | $1,773,200 | Awarded | NEW |
244 | Signal Mods in Barrio Logan | B13010 | Transportation & Storm Water | Design Bid Build | $282,800 | $427,600 | On Schedule | NEW |
245 | Friars Rd & Sea World Dr Signal Mod | B13133 | Transportation & Storm Water | Design Bid Build | $111,500 | $173,000 | On Schedule | NEW |
246 | Callado Rd Green St Infiltration BMP | B13198 | Transportation & Storm Water | Design Bid Build | $1,000,000 | $1,520,000 | On Schedule | NEW |
247 | Uptown Traffic Signal Upgrades | B14010 | Transportation & Storm Water | Design Bid Build | $121,200 | $159,500 | On Schedule | NEW |
248 | Pacific Beach DrCrwn Pt/Olney Sidewalk | B14020 | Transportation & Storm Water | Design Bid Build | $334,300 | $512,000 | On Schedule | NEW |
249 | Morena Bl & W. Bernardo Medians | B15015 | Transportation & Storm Water | Design Bid Build | $231,000 | $316,000 | On Schedule | NEW |
250 | Storm Drain Group 1008 | B15062 | Transportation & Storm Water | Design Bid Build | $74,000 | $135,000 | On Schedule | NEW |
251 | Green Infrastructure Group 1014 | B15104 | Transportation & Storm Water | Design Bid Build | $2,275,000 | $2,887,500 | On Schedule | NEW |
252 | Castle Storm Drain Replacement | B15225 | Transportation & Storm Water | Design Bid Build | $345,000 | $500,000 | On Schedule | NEW |
253 | Linda Vista/Genesee Intersection Improve | S00907 | Transportation & Storm Water | Design Bid Build | $543,584 | $888,000 | On Schedule | NEW |
254 | Switzer Canyon Bridge Enhancement | S10054 | Transportation & Storm Water | Design Bid Build | $172,000 | $263,000 | On Schedule | NEW |
255 | Midway Street Bluff Repair | S12005 | Transportation & Storm Water | Design Bid Build | $190,828 | $452,740 | Awarded | NEW |
256 | Moraga Ave to Idelwild UUD (Phase I) | B00726 | Transportation & Storm Water | Design Bid Build | $139,389 | $142,389 | On Schedule | NEW |
257 | NATL Ave (32nd to 43rd) UUD | B00787 | Transportation & Storm Water | Design Bid Build | $596,447 | $610,447 | On Schedule | NEW |
258 | District 3 Block 3-HH UUD - Street Light Design (57) | B00837 | Transportation & Storm Water | Design Bid Build | $583,076 | $728,845 | On Schedule | NEW |
259 | District 4 Block 4-Z UUD (AA370280) | B00838 | Transportation & Storm Water | Design Bid Build | $593,869 | $604,868 | On Schedule | NEW |
260 | Briarwood UUD Streetlights (Brookhaven to Nebraska) | B00848 | Transportation & Storm Water | Design Bid Build | $17,250 | $17,250 | On Schedule | NEW |
261 | 24th St UUD Streetlights (G St-Imperial) - Curb Ramp Design (20) | B10197.2 | Transportation & Storm Water | Design Bid Build | $101,400 | $124,400 | On Schedule | NEW |
262 | District 4 Block 4-AA UUD | B00826 | Transportation & Storm Water | Design Bid Build | $1,269,456 | $1,300,455 | On Schedule | NEW |
263 | Mount Alifan Dr UUD (Genesee Av-Mt Evere - Street Light Design (7) | B13148 | Transportation & Storm Water | Design Bid Build | $82,400 | $103,000 | On Schedule | NEW |
264 | Block 4N North Encanto UUD - Street Light Design (50) | B12055 | Transportation & Storm Water | Design Bid Build | $300,000 | $477,000 | Awarded | NEW |
265 | Block 6DD Bay Ho 3 UUD - Street Light Design (52) | B12065 | Transportation & Storm Water | Design Bid Build | $400,000 | $500,000 | On Schedule | NEW |
266 | District 1 Block IR UUD - Street Light Design | B00823 | Transportation & Storm Water | Design Bid Build | $717,635 | $897,043 | On Schedule | NEW |
267 | Emergency Slope Repairs at Orchard Avenue | 11003238 | Transportation & Storm Water | Design Bid Build | $35,000 | $35,000 | Awarded | NEW |
268 | Skyline Community Sign Rebuild | 21003567 | Transportation & Storm Water | Design Bid Build | $24,983 | $35,000 | Awarded | NEW |
Summary By Asset-managing Departments
When updated, this summary will show the latest amounts for those projects scheduled to be awarded in the current fiscal year and the first quarter of the next fiscal year.
Asset-Managing Department | Estimated Construction Contract Award | Estimated Total Project Cost* |
---|---|---|
Airports | $4,938,520 | $7,347,304 |
Environmental Services | $3,000,000 | $3,000,000 |
Fire-Rescue | $22,994,624 | $30,367,424 |
Library | $11,847,523 | $17,847,523 |
Office of the Chief Operating Officer | $0 | $0 |
Park & Recreation | $60,172,320 | $100,730,161 |
Police | $1,276,192 | $2,061,085 |
Public Utilities | $397,264,975 | $548,999,826 |
Public Works - General Services | $13,718,285 | $20,559,030 |
QUALCOMM Stadium | $612,000 | $884,000 |
Special Promotional Programs | $0 | $0 |
Transportation & Storm Water | $94,342,611 | $152,732,239 |
FY 2016 Total | $573,301,709 | $824,388,470 |
Postponed/Cancelled | $36,865,341 | $60,140,122 |
Total | $610,167,050 | $884,528,592 |